Building construction
Building Update 21st December 2022
Small outside verandah from the mezzanine level. PVC ceiling finally installed in the mezzanine level. Next we concentrate on electrical installation and hydraulics.
Finishing painting touches, the red/orange of the local earth with the sugarcane green of surrounding vegatation.
Comments
Post a Comment